Combined Cycle Auxiliary Operator

LEPA   Lafayette, LA   Full-time     Manufacturing / Production / Operations
Apply Now
Posted on March 15, 2020

COMBINED CYCLE PLANT AUXILIARY OPERATOR

 We are seeking an individual familiar with the operations of an electric generating facility. The ideal candidate should have a strong work ethic in

  applying this knowledge to the inspecting, monitoring and testing of auxiliary equipment used in the production of electricity in a Combined Cycle Gas Turbine power plant.

 

  Two positions (starting

  minimum pay of $16.62/Hr) are available at the LEPA Unit No. 1 power plant in Morgan City, LA. Deadline for applications is 12:00 noon on Friday, March 27, 2020. For an application, contact: Louisiana Energy & Power

  Authority (LEPA), 210 Venture Way, Lafayette, LA, 70507-5319. (337) 269-4046 or visit our website at www.lepa.com


LEPA

210 Venture Way
Lafayette , LA